Ahmed Mohammed Sulaiman Hussain Mohammed Al Marzooqi
Personal summary
A competent Project Engineer with excellent communication, organization and team work Co-ordination skills. Possessing a proven track record of preparing and executing project plans, and ensuring that work is carried out in accordance with the companies’ procedures and client’s satisfaction. Able to ensure timely, safe and cost effective design and implementation during the life cycle of projects from concept till customer satisfaction within a team work spirit.
Career Objectives
To utilize my technical project management, team work, and analytical skills for achieving required targets and developing the best performance practice in the organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the projects.
Contact
+971 4 289 4927
+971 50 852 5554
+971 4 289 4094
almarzoogi@gmail.com
15-10-1988
Education and Professional certificates
Key Skills and Competencies
• Matlab • Orcad • Microsoft office
Work experience
Duties:
- Analysing construction contracts and disputes,
- Evaluation of products and executed projects under dispute
- Communication with court system
- Reviewing Court Expert’s reports
Duties:
- Supervise and coordinates daily activities of the operating and maintenance
staff,
- Direct the implementation of the Operating Plan and Maintenance Program
and identify those areas which may need improvement or further
development
- Respond to upset conditions and take necessary corrective actions
- Ensure that start up and shut down procedures for all plant equipment and
processes are properly implemented.
Duties:
Manages small to medium size projects from inception to handover
- Reviewing project proposals and plans.
- Reviewing design, specifications, and plan and schedule changes.
- Maintains safe and clean working environment by enforcing procedures,
rules, and regulations.
- Supervising commissioning activities and maintaining high workmanship
standards.
- Supervise construction activity to ensure the project execution is in line with
technical specifications.
- Actively participates in checking the readiness of project drawings, operating
and maintenance manuals and other final documents at the project
completion stage.
- Attend clarification meetings with Clients.
- Actively participates in monitoring progress against the project schedule and
budget.
- Raises project scheduling and budget concerns with first line manager and
manages corrective actions. Lead coordination between operation and
consultants.
- Coordinates with operations to complete the scope aspects of the projects by
actively participates in formulating and evaluating solutions to ensure
alignment.
- Review and advices on fabrication, shop drawings and material submittals by
contractors.
- Participate in design review meetings with EPC/EPCM/consultants and
contributes to design optimization and the value engineering program
- Supports POV activities to ensure project is smoothly handed over to
operation on schedule
- Drives continuous improvement of initiatives to ensure project quality is of a
best practice standard.
Projects
• Supply, Installation and commissioning of Auto-Regulating / Rectifier
Transformer complete with cooling system and Rectifier unit, 50 kA, 0-1500
VDC complete with cooling system.,
• Supply and Installation of 132 kV power cables, cable sealing ends (for both
ends)
• Modification and upgrade of existing DC busbar transfer link
• All civil work associated with the supply of new busbar supports and the
modification of existing busbar supports
• Replacement of existing PL3 main DC metering unit
• Supply and installation of Fire Protection and Detection System
• Modification and upgrade to PL1 and PL3 existing Master Control Panels
(MCP)
A detailed temperature rise study inside PL3 DC busbars tunnel considering all possible scenarios of natural ventilation using computational fluid dynamics (CFD).
• Design, manufacture, test, supply 400V Switchgear at SS454
• Installation and commissioning of available Temporary LV Switchgear
• Transfer of all loads from existing LV Switchgear to temporary board.
• Dismantling of existing LV Switchgear.
• Installation, testing and commissioning of new main 400V Switchgear
• Transfer of all loads from temporary to main 400V Switchgear.
• Load Flow / Short Circuit / Co-ordination / Stability Studies.
Supply and commission 40kVA UPS with 4 hours’ battery backup for PL 1&3 - 4 Nos in total. Air-conditioning upgradation. Civil works as required to fit the new UPS systems with free space for maintenance access. Decommissioning of old UPS and batteries
• Design, manufacture, supply, delivery, install and commission 11KV MV switchgear, Relay
& Control Panels including dedicated Arc protection relay
• Design, manufacture, supply, delivery, install and commission of new 33/11kV 25MVA
Transformers
• New substation building with all building services
• Installation of mechanical and automation works related to the HVAC, Fire detection and
protection system
Membership Societies
Interests
References
Instructor of Electrical Engineering
Tel:03-7051601
E-mail: nabil@uaeu.ac.ae
Instructor of Electrical Engineering
Tel: 03-7056575
E-mail: agaouda@uaeu.ac.ae
Senior manager in capital projects –EGA